Ditch Witch Welder PR95 Manual Do Utilizador

Página de 95
Burst Pipe - 48
PR95 Operator’s Manual
Pull Pipe
CMW
Pull Pipe 
1.
Push bursting unit away from pit wall slightly.    
2.
Slide pulling brace (shown) into position. 
Ensure brace is flush with pit wall.
3.
Put bursting unit into pull mode.
4.
Enable brake.
5.
Pull back rod.
6.
Unthread and place in rod box.
7.
Continue pulling back rods until towing 
assembly reaches burster pit.