LG LS120CP(AS-C121E1H0) Manual Do Utilizador

Página de 80
- 45 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Troubleshooting Guide 
2-way,  3-way Valve 
2-way Valve (Liquid Side)
3-way Valve (Gas Side)
Shaft position
Shaft position
Service port 
Closed
Closed
Closed
(with valve cap)
(with valve cap)
(with cap) 
Open
Closed
Open
(counter-clockwise)
(clockwise)
(push-pin or with
vacumm pump)
Open
Open
Closed
(with valve cap)
(with valve cap)
(with cap)
Closed
Open
Open
(clockwise)
(counter-clockwise)
(connected manifold
gauge) 
Open
Open
Open
(with charging 
cylinder)
Open
Open
Open
(with charging
cylinder) 
Open
Open
Open
Open
Works
Shipping
Air purging
(Installation)
Operation
Pumping down
(Transfering)
Evacuation
(Servicing)
Gas charging
(Servicing)
Pressure check
(Servicing)
Gas releasing
(Servicing) 
1.
2.
3.
4.
5.
6.
Valve cap
Open position
Closed position
Pin
Service
port
Service
port cap
To outdoor unit
Flare nut
To 
piping 
connection
To outdoor unit
Hexagonal wrench (4mm)
Open position
Closed position
To 
piping 
connection
Flare nut
Open
(with charging 
cylinder)
Open
(with charging 
cylinder)