Part Number PLUS-E017-A/1206

Manual
   • Installation   • Start-Up   • Usage   • Maintenance   • Parts
Figure 21 
GOLD Plus 
30/40/60/80
 Plus 
40/60/80
•  Zoning 
with pumps
•  Primary/secondary 
piping
•  Place 
pumps  at  beginnings  of 
zones. Placing them at the ends 
of zones could result in heating 
idle zones.
•  Size 
primary circuit manifold for 
total flow of all zone pumps, with 
pressure drop of no more than 1 
foot W.C.
•  Locate 
flow/check  valves 
as  close  as  possible  to  water 
heater  boiler  side  connections 
— to reduce heat loss between 
cycles.
Wiring options:
•  Figure 
30, page 48 — WMCR 
zone controller, optional priority
•  Figure 
31, page 49 — Priority 
zone pump
•  Figure 
32, page 50 — Pump 
relays with domestic priority
•  Figure 
33, page 51 — Pump 
relays without domestic priority
1.  This drawing is conceptual only. It shows representative piping components and layout.
Weil-McLain  does  not  represent  that  this  drawing  meets  any  particular  mechanical  or
building codes. The installer is responsible for inclusion of all required safety devices, or
other miscellaneous piping hardware not shown on drawing. The installer is responsible
for proper sizing/selection of all hardware shown on this diagram.
2.  See Weil-McLain installation instructions for specific details on installing the boiler.
Notes
C
Boiler-side piping 
(except 
 Gas)
 