Sea Frost Bait Freezer Manual Do Utilizador

Página de 11
 
EVAPORATOR PLATE INSTALLATION 
 
Mount the plates on opposite walls as high as possible to take advantage of thermal 
convection.  Install the plates with the Wellnut, spacers and screws provided. 
 
 
 
The plate(s) mounts with a  
Wellnut expandable neoprene blind 
hole fastener.  A template or the plate itself 
should be used to locate the mounting 
holes.  Drill a 3/16" pilot hole.  Increase 
this hole to 3/8".  Install the screw into the 
plate through the spacer then tighten the 
screw in the Wellnut. Install the plate 
pushing the rubber mounts in to the pre-
drilled holes.  Tighten the screws.  
 
 
 
 
 
 
QUICK CONNECT FITTING INSTRUCTIONS 
 
 
Aeroquip quick connect fittings are used in this pre-charged system.  These fittings 
reseal upon disconnecting and do not leak during assembly. 
 
If installing this compressor in an existing system.  Use LSA line adapters to 
interface with the new compressor.  Attach, evacuate using a vacuum pump, leak 
check, and then add a vapor charge of R-134a before connecting to the pre-
charged condensing unit. 
 
In a pre charged system installation make all the connections up to the 
compressor first
.  The last two connections should be the suction fitting then the 
discharge fitting. 
 
To assemble, remove the heat shrink and plastic cap.  Be sure the threads and the end 
of the fittings are clean.  
 
Finger tighten the fittings to avoid cross threading. Tighten to wrench snug and then pull 
up 1/16  turn.  
 
When making all connections, USE TWO WRENCHES.  Don’t allow the fittings to turn 
or twist when tightening.