Wine Guardian 1 Ton Water Cooled 8,000 BTU Wine Cooling Unit Instrução De Instalação

Página de 54
36
Inspection and Start-up Checklists
Receiving and Inspecting
 Unit received undamaged
 Unit received complete as ordered including accessories
Handling and Installing
 Unit mounted on solid level surface
 Sufficient space allowed for access to unit and accessories
 Proper electrical service provided
 Hot water provided to humidifier
 Drain lines and trap installed properly
 Ductwork, fittings and grilles installed properly
 All cold duct surfaces insulated
 Low ambient control included if freezing condition present
 No obstructions to air flow to condenser
Starting-up the Unit
 General visual inspection looks good
 All wiring connections checked
 All ducts, grilles and panels in place
 Start unit
 Check ducts and connections for air leaks
 Balance air distribution
 Confirm condenser airflow is unrestricted
 Verify cooling and heating operation
 Check for excessive noise or vibration