Overload Device 
Overload protection is integrated into the motor body and is 
standard  on  -E  versions.  The  overload  system  is  based  on 
detection of the difference in air pressure between the inlet 
and  outlet  ports.  It  consists  of  a  valve  which  is  normally 
closed.  The  valve  senses  pressure  at  the  motor  inlet  and 
outlet  and  compares  the  difference  between  the  two 
pressures  to  the  index  value  established  by  spring 
adjustment. A difference in pressure greater than the index 
value causes the emergency stop to be activated. This then 
exhausts the air and hoist operation stops. 
Overload  protection  is  adjusted  at  the  factory  to  120%  of 
the  safe  working load (SWL). It is also able to operate on 
both  sides  for  mining  versions  with  two  bottom  hooks. 
Refer  to  the  "MAINTENANCE"  section  for  adjustment 
procedures. 
 
Main Air Shut-off Valve 
The main air shut-off valve is completely integrated into the 
motor body and is standard on -E versions. 
 
Chain container 
 
1. Check the chain container size to make sure the length of 
the load chain is within the capacity of the chain container. 
Replace with a larger chain container if required. 
2. When a chain bucket is used, Install a chain buffer on the 
15th link from the end of the chain. 
3. Attach the chain container to the hoist.  
4. Run bottom block to the lowest point and run hoist in the 
"UP" direction to feed the chain back into the container. 
 
NOTICE 
•  Allow  chain  to  pile  naturally  in  the  chain  container. 
Piling  the  chain  carelessly  into  the  container  by  hand 
may lead to kinking or twisting that will jam the hoist. 
 
Attaching Limit Stop 
1. On hoists without a chain bucket, slide buffer and washer 
onto chain.  
2. Install limit stop as described under "Chain Container". 
3. Run hoist slowly in the "DOWN" direction to verify limit 
stop activates cutout. 
 
Storing the Hoist 
 
1. Always store the hoist in a no load condition. 
2. Wipe off all dirt and water. 
3. Oil the chain, hook pins and hook latch. 
4. Place in a dry location. 
5. Plug hoist air inlet port. 
6. Before returning hoist to service, follow instructions for 
hoists not in regular service in the "INSPECTION" section. 
 
 
ADJUSTMENT TROLLEY LCA015S/LCA030D
 
 
Pre-adjust  trolley  for  installation  using  Dwg.  D5230233  and  the 
following instructions. 
1. Fasten tightening nuts (74) to one end of suspension shaft (75), 
using  springwashers  (73)  ,  apply  Loctite®  243  to  capscrews 
threads. 
2. Measure beam flange width and establish required position for 
spacers. Install required outside spacers on suspension shaft (75). 
3. Thread a nut (66) onto each end of the screw rod (67), as far to 
the center as possible. 
4. Insert one end of this rod into the side plate and loosely fasten 
with another nut (66). 
5. Insert suspension shaft through side plate (36). 
6. Install an equal number of spacers to each side of hoist 
support  (35),  and  sprokets  wheels  support  (58),  on  suspension 
shaft. 
 
  NOTICE
 
• The total clearance between the beam and the trolley wheel 
flanges  is  4  to  8  mm  when  trolley  is  installed  correctly.  As 
shown  in  Dwg.  D5230233,  the  difference  between  dimensions 
“X” and “Y” equals the total clearance. 
7. Support the assembled portion of trolley on the beam. 
8. Install second side plate (37). 
9.  Place  the  rest  of  spacers  on  the  suspension  shaft  and  secure 
loosely with nutsand springwashers. 
10.  Verify  trolley  wheel  to  beam  total  clearance.  Adjust  spacer 
locations  until  clearance  specification  is  attained  (refer  to  Dwg. 
D5230233). Apply Loctite® 243 to nuts and secure in place. 
11. Screw inner nuts (66) out  until  they contact  with side plates. 
Thread  outside  nuts  (66)  onto  screw  or  until  tight  against  side 
plates. Check that side plates are perpendicular to beam. 
12. Upon completion of installation, ensure trolley beam stops are 
installed  and  conduct  initial  operating  checks  as  described  in 
“OPERATION”  section.  Check  that  side  plates  are  vertical  and 
parallel to each other. 
 
 
(Dwg.D5230233