Справочник Пользователя для Invacare 3600XL

Скачать
Страница из 36
SECTION 2—PARTS AND INSTALLATION
21
9. Check for leaks in supply or drain lines and check operation of tub. Refer to Operating 
NOTE: Check local codes regarding maximum water temperature allowed at hot water outlets for 
facility type.
FIGURE 2.5   Plumbing Installation
Post Installation Checklist
Before putting the tub into service, check the following:
❑ Water lines have been purged of any foreign matter.
❑ Both hot and cold water lines are properly connected to tub.
❑ Dedicated 115V 15AMP AC power line is properly wired to unit.
❑ Power line is protected by a 15AMP GFCI.
❑ All water lines are checked for leaks.
❑ ICCG skin care and cleaning products have been ordered. To place your order, call 
800‐668‐2337.
❑ ICCG representative has been called at 800‐668‐2337 to arrange for an In‐Service on 
tub.
DETAIL “A” - 
PLUMBING 
SCHEMATIC
HOT
COLD
Tub Fill Valve
Backflow 
Preventor
Flowmeter
Invacare 
Disinfectant
Check 
Valve
Pump
Suction Return Line
Burp 
Fitting 
Shower Control 
Valve
RADA Mixing Valve
Optional 
Pressure 
Regulator
Back 
Flow 
Disinfectant 
Injector
In House Water Service
3-Way 
Selector 
Valve
Tub Spout
Check 
Valve
(Nearest 
Tub)