Справочник Пользователя для Jacuzzi J - 465

Скачать
Страница из 104
Page 63
J-400
6.  Once back to the “Program B” Main  
Menu, press the Down button on the 
Quad Keypad to select “Start Time” 
(Figure M). Press the Left or Right 
button on the Quad Keypad to select 
the time you wish the spa to run. 
Press the Down button on the Quad 
keypad to access the “Duration” 
setting.
note: If you are using a standard 12-hour period, you will see the hour 
displayed as “1PM”. For the 24-hour period it will read “1300”.
7.  Now you will need to adjust the 
“Duration” (Figure N) of the cycle. 
The duration range is from 0 (OFF) 
to 6 hours. Press the Left or Right 
button on the Quad Keypad to make 
your adjustment(s) in increments of 1 
hour. 
note: The default “Duration” is OFF.
8.  Press the Splash button on the Quad Keypad to save your changes 
and return to the Heating Menu.
9.  Press button D to exit the Heating 
Menu and return to the Settings 2 
Main Menu. If you have 
programmed both heating cycles 
and the settings have been 
accepted, you will see the two 
program icons next to word Heating 
on the display (Figure O). If only one 
cycle was programmed, there will only be one icon. If no 
cycles were programmed there would be a thermometer with wavy 
arrows as the icon.
13.4  Clean-up “blow-out” Cycle
The clean-up cycle is once per day in both Auto-Heating and 
Programmable modes at 12:00 (noon) for two minutes. This is not user 
programmable. Each jets pump activates for one minute to circulate any 
water in the plumbing unless a pump has just finished a 20 minute time 
out, it will not automatically activate for the clean-up cycle. Be aware, the 
factory programmed clean-up cycle cannot be canceled or altered!
PROGRAM   B
Start Time
Day Settings
Duration
Select
B
Start Time
Press         to save
1AM
Figure M
PROGRAM B
Start Time
Day Settings
Duration
Select
B
Press         to enter
Duration
OFF
Figure N
Primary
Secondary
Heating
Press         to 
reset to default
SETTINGS 2
OFF
A
B
Figure O