Справочник Пользователя для Franke Consumer Products FTU 3807 I

Скачать
Страница из 60
 
 
 
 
 
EN 
 
2
0
 
20 
INSTALLATION
 
 
Drilling the Ceiling/shelf and fixing the frame 
DRILLING THE CEILING/SHELF 
•  Use a plumb line to mark the centre of the hob on the ceiling/support shelf. 
•  Place  the  drilling  template  21  provided  on  the  ceiling/support  shelf,  making  sure  that  the 
template is in the correct position by lining up the axes of the template with those of the hob. 
•  Mark the centres of the holes in the template. 
•  Drill the holes at the points marked: 
•  For concrete ceilings, drill for plugs appropriate to the screw size. 
•  For hollow brick ceilings with wall thickness of 20 mm: drill ø 10 mm(immediately insert 
the Dowels 11 supplied). 
•  For wooden beam ceilings, drill according to the wood screws used. 
•  For wooden shelf, drill ø 7 mm. 
•  For the power supply cable feed, drill ø 10 mm. 
•  For the air outlet (Ducted Version), drill according to the diameter of the external air ex-
haust duct connection. 
•  Insert two screws of the following type, crossing them and leaving 4-5 mm from the ceiling: 
•  For concrete ceilings, use the appropriate plugs for the screw size (not provided). 
•    for Cavity ceiling  with inner space,  with wall thickness of  approx. 20 mm, Screws 12h, 
supplied. 
•  For wooden beam ceilings, use 4 wood screws (not provided). 
  •  For wooden shelf, use 4 screws 12g with washers 22 and nuts 23, provided.