Справочник Пользователя для American Panel AP40BC250-12

Скачать
Страница из 42
INSTALLATION
 
13 
 
PHOTO #9 
C. Refrigeration Unit Installation 
 
C.1. Preparation 
 
9  Check the integrity of the unit once it is unpacked 
9  Check to make sure the floor is leveled   
9  Check that the available power supply corresponds to the ratings on the unit’s nameplates and correctly rated 
electrical protection is provided. 
9  If additional refrigerant should be needed, be certain to use the correct type. 
9  Make certain that adequate drainage is provided. 
9  If a remote condensing unit is used, be certain that it is positioned within the range indicated in this manual and that it 
is connected as specified and in accordance with all applicable electrical codes.  
 
C.2. Find The Location 
 
Ambient air temperature for air-cooled condensing units must be no greater than 95
° F to ensure the rated performance. 
The condensing unit must be located away from direct sunlight if installed outdoors; or, if it is indoors, it should be in an 
appropriate room in which air change is guaranteed to be no less than 318,000 cubic feet per hour. 
SPECIFICATIONS TO USE DURING INSTALLATION: 
i) 
CABINET 
 
AP40BC250-12 
BCCP-1 
AP40BC250-2-12 
BCCP-2, BCIP 
ii) 
AIR COOLED 
REMOTE CONDENSING UNIT 
(4HP)(OPTIONAL) 
Voltage 120/208V 
120-208V 
208V 
Phases 1 
Amperage 10 
20 
20 
Circuit size 
15 
30 
30 
Power supply cable 
12-4 
10-4 
10-4 
 
 
Note:   The condensing unit and the cabinet must be connected to separate