Справочник Пользователя для Emerson I-0021
4.6 Span Calibration
90003482(2) [NGA-e (MLT-Software 3.2.X)] 07/98
NGA 2000
4 - 43
Display
Status...
Main...
Channel
Calib...
TAG
F1
F2
F3
F4
F5
Failures:
No
Maintenance-Requests:
No
Temperature:
20.0 C
Operation:
Ready
0.0
100.0
Range: 1
37.50
ppm CH4
0.00
50.00
Measure
Status...
Channel
Back...
TAG
F1
F2
F3
F4
F5
37.50 ppm
-- Analyzer Module Calibration --
Calibration procedure status...
Start span calibration procedure !
Expected span gas:
50.00 ppm
Span gas name:
Methane
Start zero calibration procedure !
Expected zero gas:
0.00 ppm
Valves...
Valve position:
Samplegas
Time & Date:
12:50:55 June 16, 1998
Measure
Status...
Channel
Back...
TAG
F1
F2
F3
F4
F5
37.50 ppm
-- Analyzer Module Calibration --
Calibration procedure status...
Start span calibration procedure !
Expected span gas:
50.00 ppm
Span gas name:
Methane
Start zero calibration procedure !
Expected zero gas:
0.00 ppm
Valves...
Valve position:
Samplegas
Time & Date:
12:50:55 June 16, 1998
⇒
⇒
Change to the
menu "Analyzer
Module Calibration"
menu "Analyzer
Module Calibration"
Press
F5
Caution:
Before starting span
calibration, realize that
spangas with correct
concentration is available !
(See also section 5.1.1,
p.5-5... !)
calibration, realize that
spangas with correct
concentration is available !
(See also section 5.1.1,
p.5-5... !)
⇒
⇒
Change to the line
"Start span calibration
procedure !"
"Start span calibration
procedure !"
Press
twice to get
the line "Start span
calibration procedure !"
white on black.
calibration procedure !"
white on black.
Notes:
•
Normally, all measurement
ranges of the same chan-
nel will be calibrated simul-
taneously.
ranges of the same chan-
nel will be calibrated simul-
taneously.
•
⇒
⇒
Start the
span calibration
span calibration
Press
or