Chapter 3  Installing the Library
Preparing the Library for Operation
32
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
Preparing the Library for Operation
3
After the library is installed and connected to the host, you can 
perform the procedures listed below as needed to prepare the 
library for operation.
For a description of how to perform these procedures, refer to the 
Quantum|ATL 7100 Series Tape Library Operator’s Guide.
Defining the library power-up state
Enabling/disabling the auto clean option
Enabling/disabling the auto load option
Setting the language used for the status display area
Enabling/disabling 4/52 identity mode
Loading the library with cartridges (either through the load 
port or by bulk loading of cartridges through the storage array 
door)
Performing an inventory
Turning the interior light on or off