Справочник Пользователя для IP Mobilenet LLC B64450G25

Скачать
Страница из 27
 
SECTION 4:  PRODUCT INSTALLATION
 
 
 
637246.DOC  
Page 
11
 
Installation Overview 
 
This chapter provides the basic setup involved in the installation process of an IPSeries High Speed Base 
Station.   For backhaul requirements, refer to Appendix A of this document. 
 
S
 
Standard considerations such as air flow clearance above the base station for heat dissipation 
and ensuring adequate space exists behind the base station for the routing of cables are of 
primary importance. 
 
 
A minimum clearance of 1 rack space is recommended for natural convection cooling.  
Adjustment points are available through holes in the base station’s bottom cover.  Sufficient 
space below the base station should exist to facilitate adjustments. 
 
 
Coax, power, and interface cabling service lengths with neat routing will make the removal and 
replacement of the base station easier for functional testing and maintenance purposes. 
 
To prevent injury and damage to the base station, exercise extreme caution throughout the 
installation process and follow the reminders listed below. 
 
ƒ
  Follow safety precautions for handling rack unit installations. 
 
ƒ
  Do not alter the components listed in the Installation Requirements section, unless 
substituions are noted within this chapter.