SECTION 4:  PRODUCT INSTALLATION
 
 
 
637246.DOC  
Page 
18
 
 
Post Installation Checklist 
 
The following table lists the tasks that should be performed upon completing installation. 
 
TABLE 5: POST INSTALLATION CHECKLIST 
NO. CHECKLIST 
ITEM 
;
 
Scope out the entire area setup to locate any obvious problem areas. 
…
 
Check antenna routing for safety concerns and near-field boundary setup. 
…
 
Use tie wraps, where possible to ensure that all cables routed in parallel are 
bundled together. 
… 
Perform appropriate testing to ensure base station works properly. 
… 
 
 
 
Once installation is complete make sure the area is clear of debris that would prevent proper 
airflow and ventilation.