APC by Schneider Electric
MGE GALAXY 5000
Data Center Grade Three Phase Uninterruptible Power Supply
Single Module - Guide Specifications
40-130 kVA UPS
THIS GUIDE SPECIFICATION IS WRITTEN IN ACCORDANCE WITH THE CONSTRUCTION SPECIFICATIONS INSTITUTE
(CSI) MASTERFORMAT. THIS SECTION MUST BE CAREFULLY REVIEWED AND EDITED BY THE ARCHITECT OR THE
ENGINEER TO MEET THE REQUIREMENTS OF THE PROJECT. COORDINATE THIS SECTION WITH OTHER
SPECIFICATION SECTIONS IN THE PROJECT MANUAL AND WITH THE DRAWINGS.
WHERE REFERENCE IS MADE THROUGHOUT THIS SECTION TO “PROVIDE”, “INSTALL”, “SUBMIT”, ETC., IT SHALL MEAN
THAT THE CONTRACTOR, SUBCONTRACTOR, OR CONTRACTOR OF LOWER TIER SHALL “PROVIDE”, “INSTALL”,
SUBMIT”, ETC., UNLESS OTHERWISE INDICATED.
THIS SECTION IS WRITTEN TO INCLUDE THE 2004 MASTERFORMAT AND THE 1995 MASTERFORMAT VERSIONS.
WHERE APPLICABLE, THESE ITEMS ARE BRACKETED AND, IN EACH CASE, UNLESS OTHERWISE INDICATED, THE
FIRST CHOICE APPLIES TO THE 2004 MASTERFORMAT AND THE SECOND CHOICE APPLIES TO THE 1995
MASTERFORMAT.
(CSI) MASTERFORMAT. THIS SECTION MUST BE CAREFULLY REVIEWED AND EDITED BY THE ARCHITECT OR THE
ENGINEER TO MEET THE REQUIREMENTS OF THE PROJECT. COORDINATE THIS SECTION WITH OTHER
SPECIFICATION SECTIONS IN THE PROJECT MANUAL AND WITH THE DRAWINGS.
WHERE REFERENCE IS MADE THROUGHOUT THIS SECTION TO “PROVIDE”, “INSTALL”, “SUBMIT”, ETC., IT SHALL MEAN
THAT THE CONTRACTOR, SUBCONTRACTOR, OR CONTRACTOR OF LOWER TIER SHALL “PROVIDE”, “INSTALL”,
SUBMIT”, ETC., UNLESS OTHERWISE INDICATED.
THIS SECTION IS WRITTEN TO INCLUDE THE 2004 MASTERFORMAT AND THE 1995 MASTERFORMAT VERSIONS.
WHERE APPLICABLE, THESE ITEMS ARE BRACKETED AND, IN EACH CASE, UNLESS OTHERWISE INDICATED, THE
FIRST CHOICE APPLIES TO THE 2004 MASTERFORMAT AND THE SECOND CHOICE APPLIES TO THE 1995
MASTERFORMAT.
SECTION [26 33 63] [16611]
SOLID STATE UNINTERRUPTIBLE POWER SUPPLY
PART 1 - GENERAL
1.1 RELATED
DOCUMENTS
A.
Drawings and general provisions of the Contract, including General Conditions,
[Division 01 - GENERAL REQUIREMENTS] [Division 1 - GENERAL REQUIREMENTS], and
other applicable specification sections in the Project Manual apply to the work specified in this
Section.
[Division 01 - GENERAL REQUIREMENTS] [Division 1 - GENERAL REQUIREMENTS], and
other applicable specification sections in the Project Manual apply to the work specified in this
Section.
1.2 SUMMARY
A.
Scope: Provide design and engineering, labor, material, equipment, related services, and
supervision required, including, but not limited to, manufacturing, fabrication, erection, and
installation for a solid state uninterruptible power supply (UPS) as required for the complete
performance of the work, and as shown on the Drawings and as herein specified.
supervision required, including, but not limited to, manufacturing, fabrication, erection, and
installation for a solid state uninterruptible power supply (UPS) as required for the complete
performance of the work, and as shown on the Drawings and as herein specified.
B.
Section Includes: The work specified in this Section includes, but shall not be limited to, a
three-phase, on-line, double conversion, solid state UPS. The UPS shall operate in conjunction
with the existing building electrical system to provide high quality power conditioning, back-up
power protection, and distribution for electronic equipment loads. The system shall consist of a
solid state IGBT rectifier/inverter, power factor corrected rectifier, a 100 percent rated for
continuous duty static switch, battery plant, graphical status/control panel, and synchronizing
circuitry as described herein.
three-phase, on-line, double conversion, solid state UPS. The UPS shall operate in conjunction
with the existing building electrical system to provide high quality power conditioning, back-up
power protection, and distribution for electronic equipment loads. The system shall consist of a
solid state IGBT rectifier/inverter, power factor corrected rectifier, a 100 percent rated for
continuous duty static switch, battery plant, graphical status/control panel, and synchronizing
circuitry as described herein.
1.3 REFERENCES
A.
General: The publications listed below form a part of this Specification to the extent referenced.
The publications are referred to in the text by the basic designation only. The edition/revision of
the referenced publications shall be the latest date as of the date of the Contract Documents,
unless otherwise specified.
The publications are referred to in the text by the basic designation only. The edition/revision of
the referenced publications shall be the latest date as of the date of the Contract Documents,
unless otherwise specified.
B.
Institute of Electrical and Electronics Engineers, Inc. (IEEE):
1.
1.
ANSI/IEEE C62.41, "Recommended Practice for Surge Voltages in Low-Voltage AC Power
Circuits" (copyrighted by IEEE, ANSI approved).
Circuits" (copyrighted by IEEE, ANSI approved).
C.
International Organization for Standardization (ISO):
1.
1.
ISO 9001, "Quality Management Systems - Requirements."