Справочник Пользователя для Panasonic CU-2E15GBE

Скачать
Страница из 77
 
20 
9.2 Outdoor 
Unit 
9.2.1 CU-2E15GBE 
 
FUSE T 3.15 A
L 250 V
W
Y
V
B
R
COIL COIL
COMPRESSER
U
CN-
FM1
(W
H
ITE
)
IC4
FA
N
 M
O
T
O
R
45
6
7
1
BL
WH
FM
B
Y
R
RY
-C
Q1
PS21245-A
T
Low
V
oltag
e
Power Supply
L
P
L
L
P
P
13
CN-DIS (W
HITE
)
T
EST
ELECTRONIC CONTROL
UNIT
13
CN-T
H
3
(Y
E
LLOW
)
13
2
4
CN-T
H
2
(Y
E
LLOW
)
13
24
CN-T
H
1
(W
HITE
)
COMMUNICATION
CIRCUIT
13
24
5
6
13
24
1
3 2
4
12V
1
3 2
4
1
3 2
4
1
3 2
4W
H
WH WH WH
WH WH WH WH
56
CN-EV2 (Y
E
LLOW
)
CN-EV1 (W
HITE
)
(UNI
T
 B
)
COIL
 COM
P.
(UNIT
 A
)
COI
L COM
P.
230/50Hz
SINGLE PHASE
T
O
 INDOOR UNI
T
 B.
T
O
 INDOOR UNI
T
 A
.
WH
WH
BL
R
BL
WH
COIL
COIL
EXP
.
VA
LV
E
SENSOR
DIS. PIPE TEMP.
SENSOR
PIPE TEMP.
SENSOR
PIPE TEMP.
SENSOR
PIPE TEMP.
SENSOR
S. COND TEMP.
SENSOR
AIR TEMP.
P
N
GR
BL
Y
R
OR
EXP
.
VA
LV
E
GR
BL
Y
R
OR
RY
-H
O
T
BL
BL
HO
T
2
(B
LA
C
K
)
HO
T1
(B
LA
C
K
)
CT
RY -
 AC
RY -
 P
W
R
PT
C
2
PT
C
3
GR
Y1
(G
R
AY
)
FM
1
(R
E
D
)
FG
1
(G
R
E
E
N
)
CN
 - D
C
(WH
IT
E
)
AC
2
(B
LA
C
K
)
AC
1
(B
LA
C
K
)
DA
TA
2
(B
R
O
WN
)
CO
NN
E
C
TO
R
(WH
IT
E
)
BL
BL
BL
BL
CO
NN
E
C
TO
R
(B
LA
C
K
)
AC
-B
LK
(B
LA
C
K
)
AC
-W
H
T
(WH
IT
E
)
DA
TA
1
(R
E
D
)
GR
Y
2
(G
R
AY
)
GR
RE
A
C
TO
R
C
O
IL
 C
O
M
P.
(4
-W
AY
VA
LV
E
)
CONNECTOR
(YELLOW)
GR
R
G
G
TERMINAL
TERMINAL
TERMINAL
BR
BL
FUSE 20.0A
FU
S
E
T 5.0
A
L 250
V
BL
BL
Y / G
12
3
12
3
LN
ELECT
R
ONIC CONT
ROL
UNIT
FUS
E
T 3.15
A
L 250
V
AC1 (B
LA
CK
)
AC2 (B
LA
CK
)
CN - DC (W
HITE
)
12V
5V
5V
12V
12V
5V
5V
5V
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
RESIS
TANCE (
)
TEMPERATURE (kΩ)
-10
0
10
20
30
40
50 60
1
3
2
4
1. Outdoor air temp.
2. Pipe temp. A, B
3. Heat exchanger temperature
4. Discharge temperature
CN-S
•  The unit turn to the Rated Frequency Cooling Operation by short-circuiting
   CN-S after applying power between the terminal 1 and 2.
•  Operation of the compressor and the outdoor fan motor can be checked by
   applying power short-circuiting CN-S.
Outdoor
Function
Time
 First deice operation time
 Deice operation starting time
 Deice forced completion
 Deice operation completion
 Deice detection
 Compressor forced operation time
 Compressor operation frequency step up
 Deice operation starting 3°C
 60 min
 45 sec
 10 min 30 sec
 59 sec
 40 min
 80 min
 120 min
 30 sec
 60 sec
 3 min
 DC peak detection after compressor restart
 3 min
 6 sec
 4.5 sec
 63 sec
 5.9 sec
 8 sec
 16 sec
 24 sec
 0
 0
 1.8 sec
0