Справочник Пользователя для Samsung MH026FPEA

Скачать
Страница из 208
Samsung Electronics
14-8
Pump down will be carried out when an evaporator is replaced or when the unit is relocated in another area.
1) Remove the caps from the 2-Way valve and 
the 3-Way valve.
3) Set the unit to cool operation mode.
(Check if the compressor is operating.)
4) Turn the 2-Way valve clockwise to close.
7) Close the cap of each valve.
2) Turn the 3-Way valve clockwise to  close and
connect a pressure gauge (low pressure side) 
to the service valve, and open the 3-Way valve
again.
5) When the pressure gauge indicates "0" turn the 
3-Way valve clockwise to close.
6)
Stop operation of the air conditioner.
14-6 "Pump down" Procedure
2-Way Valve
3-Way Valve
Relocation of the air conditioner
• Refer to this procedure when the unit is relocated.
• 
1. Carry out the pump down procedure (refer to the details of ‘pump down’).
• 
2. Remove the power cord.
• 
3. Disconnect the assembly cable from the indoor and outdoor units.
• 
4. Remove the flare nut connecting the indoor unit and the pipe.
• 4. 
At this time, cover the pipe of the indoor unit and the other pipe using a cap or vinyl plug to avoid foreign
material entering.
• 
5. Disconnect the pipe connected to the outdoor unit.
• 4. 
At this time, cover the valve of the outdoor unit and the other pipe using a cap or vinyl plug to avoid foreign
material entering.
• 
6. Make sure you do not bend the connection pipes in the middle and store together with the cables.
• 
7. Move the indoor and outdoor units to a new location.
• 
8. Remove the mounting plate for the indoor unit and move it to a new location.
14-6-1 MH040FXEA2/MH052FXEA2/MH14
✳✳2X/MH16✳✳2X/MH18✳✳2X/MH19✳✳2X
 24296A(1)_2  11/11/05 5:07 PM  Page 12-22