Справочник Пользователя для Patterson-Kelley TBIG-03

Скачать
Страница из 24
 
 
Installation 
 
 
*
*
*
*
*
*
propane
connection
manual  
shutoff
natural gas
connection
manual  
shutoff
regulator
low gas
pressure switch
motorized gas valve
(propane)
low gas
pressure switch
motorized gas valve
motorized gas valve
(natural gas)
high gas pressure
switch
pressure tap
burner
secondary
shutoff, manual
pilot 
shutoff
regulator
pilot regulator and
solenoid valve
mechanical link
to control air
(Lo-Hi-Lo only)
Items with     symbol must be
vented to outside.  Refer to the 
drawings packed with your 
boiler for additional information.
leak test
valves
n.o. vent valve
(I.R.I. only)
 
 
Figure 4-1  Piping Schematic for the Twin-Fuel Gas Train 
 
 
4.0  I
NSTALLATION
 
 
 
Gas Train Connection Sizes 
 
Natural Gas 
Propane 
700/1000/1200 
Series 
 
1 1/4" 
 
1" 
1500/1700/2000 
Series 
 
2" 
 
1 1/4" 
 
 
4.1  G
ENERAL
 
 
Installation of the twin-fuel Gemini™ boiler is similar 
to that of the single-fuel model.  Refer to “Thermific
â 
Gas-Fired Boiler - Installation and Owner’s Manual - 
TBIG” pages 2 through 10. 
The following procedures are different from those for 
the single-fuel model, and are described in this Sec-
tion: 
·  Gas Piping 
 
Gas Bleeds and Vents 
·  Pre-Start Check List 
·  Pre-Start Safety Checks and Adjustments 
 
Test of Ignition Safety System 
Test of Low Water Cutoff 
Test of High Limit Control 
Test of Gas Pressure Switch 
 
 
- 5 -