Справочник Пользователя для Sound Performance Lab PQ Recording Equalizer

Скачать
Страница из 10
4
Installation
BEFORE SWITCHING ON POWER SUPPLY AND PQ, THE PQ MUST BE CONNECTED TO 
THE POWER SUPPLY WITH THE SUPPLIED MULTICORE LEAD. PAY ATTENTION TO A 
SECURE CONNECTION.
The PQ and the external power supply should be situated away from heat sources 
and direct sunlight. PQ and power supply need suffi cient air circulation. Avoid instal-
lation in environments exposed to vibrations, dust, heat, cold, moisture or electrical 
and magnetic fi elds. 
Do not install the unit in proximity to power amplifi ers or digital processors. You 
may consider placing it in a rack containing other analog gear. Such placement can 
prevent interference from Word Clock, Smpte, MIDI, etc. 
• Do not open the case. You may risk electric shock and may damage your equip-
ment.
• Leave repairs and maintenance to a qualifi ed service technician. Should foreign 
objects fall inside the case, contact your authorized dealer or support  person.
• To avoid electric shock or fi re hazards do not expose your unit to rain or damp-
ness.
•  In case of lightning unplug the power supply. Please unplug the cable by pulling on  
the plug only; never pull on the cable.
•  Never force a switch or knob.
•  To clean the case use a lint-free cloth. Avoid cleaning agents as they may  damage 
the chassis. 
• Please support the back of the unit whenever it is being mounted into a 19  inch 
rack (especially important when touring).
Setting the appropriate supply voltage
The appropriate supply voltage (115 V/230 V) must be set on the rear panel of the 
external power supply. The fuse block (left from the power cord socket) can be 
inserted in two positions to meet your country‘s power requirements. Refer to the 
marks on the fuse block (triangles for both voltages) and insert the block with the 
appropriate triangle pointing to the white line on the fuse block case.
The power supply is fi tted with 3,5 A fuses, slow blow.
Power-up sequence
It takes about four seconds until the power-up sequence is completed. During this 
procedure, all potentiometers will move to the center (12 o’clock) position and a test 
routine checks all 32 relays (you will notice 32 clearly audible relay clicks).
After fi nishing the power-up sequence the unit is ready to operate.
 
Ground Lift switch
A switch labelled „GND LIFT“ is placed on the rear panel of the power supply. It serves 
to eliminate hum problems. This switch physically separates chassis ground from AC 
ground; GND LIFT is activated (=chassis ground separated) when the switch points 
downwards.