COMPONENTS
TEST PROCEDURE
RESULTS
RELAY
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Check for continuity of relay with an 
ohm-meter.
(Remove lead wires from relay and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 100)
Measure the resistance.
(Ohm-meter scale: R x 1000)
Normal: Approx. 
ON: 0 ohm
OFF: 
ohms
Abnormal: Infinite or several 
ohms.
Normal: Approx. 50 ~ 150 ohms
Abnormal: Infinite or several 
ohms.
Normal: Approx. 2 ~ 4K ohms
Abnormal: Infinite or several 
ohms.
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS   SERVICED FOR
ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE CONNECTOR, NOT
THE WIRES.