Инструкции По Установке для GE PVW73

Скачать
Страница из 16
31-11007
3
INST
ALL
ATION PREP
ARA
TION
Installation Preparation
POWER SUPPLY
IMPORTANT – (Please read carefully)
WARNING:
FOR PERSONAL SAFETY, THIS APPLIANCE MUST BE 
PROPERLY GROUNDED.
Remove house fuse or open circuit breaker 
before beginning installation.
Do not use an extension cord or adapter plug 
with this appliance. Follow National Electrical 
Codes or prevailing local codes and ordinances.
Electrical supply
These vent hoods must be supplied with 120V, 
60Hz, and connected to an individual, properly 
grounded branch circuit, and protected by a 15 
or 20 amp circuit breaker or time delay fuse.
• Wiring must be 2 wire with ground.
•  If the electrical supply does not meet the above 
requirements, call a licensed electrician before 
proceeding.
•  Route house wiring as close to the installation 
location as possible in the ceiling or wall. 
•  Connect the wiring to the house wiring in 
accordance with local codes.
Grounding instructions
The grounding conductor must be connected to 
a ground metal, permanent wiring system, or an 
equipment-grounding terminal or lead on the hood.
WARNING:
 The improper connection 
of the equipment-grounding conductor can result 
in a risk of electric shock. Check with a qualified 
electrician or service representative if you are in 
doubt whether the appliance is properly grounded.
ADVANCE PLANNING
Duct Install Planning
•  This hood is designed to be vented vertically 
through the ceiling. Use a 6" round duct. Use 
locally supplied elbows to vent horizontally 
through the rear wall. 
• Use metal ductwork only.
• Determine the exact location of the vent hood.
•  Plan the route for venting exhaust to the 
outdoors. To maximize the ventilation 
performance of the vent system:
1.  Minimize the duct run length and number of 
transitions and elbows.
2. Maintain a constant duct size.
3.  Seal all joints with duct tape to prevent any 
leaks.
4. Do not use any type of flexible ducting.
•  Install a wall cap or roof cap with damper 
at the exterior opening. Purchase the wall or 
roof cap and any transition and length of duct 
needed in advance.
•  When applicable, install any makeup 
(replacement) air system in accordance 
with local building code requirements. Visit 
GEAppliances.com for available makeup air 
solutions.
Recirculation Install Planning
A recirculation duct (included) and one charcoal 
filter (not included) are necessary for recirculation 
installation.
Power Supply Planning
The location of the power supply connection is 
called out in the Prepare the Wall section on 
page 6.