Справочник Пользователя для Sterling SSL

Скачать
Страница из 66
 
17 
Chapter 3:  Installation 
3-1 Work 
Rules 
Install, operate, and maintain this equipment according to all applicable work and safety codes. 
This includes, but is not limited to: OSHA, NEC, CSA, and any other local, national, and 
international regulations. Obey these specific work rules: 
 
;
  Read and follow these instructions when installing, operating and 
maintaining this equipment. If the instructions become lost or 
unreadable, obtain a new copy from the manufacturer. 
;
  Only qualified persons should work on or with this equipment. 
;
  Work only with approved tools and devices. 
;
  Disconnect and lock out electric power before maintaining or 
servicing a hopper loader. If the unit is installed with a power cord 
that can be unplugged, unplug it. If the unit is permanently wired to a 
power main, have a fused power disconnect, capable of being locked 
in the OFF position, installed. 
 
3-2 Safety 
Considerations 
;
  Connect the hopper loader to a grounded three-prong power 
receptacle. If this is not possible, ground the hopper loader motor for 
electrical isolation and protection from electric shock. 
;
  Do not use hopper loaders in explosive atmospheres. 
;
  Do not use outdoors or in wet environments. Moisture damages the 
motor and can create an electric shock hazard. 
;
  Operate hopper loaders at the rated voltage. Operation at other than 
design voltage can result in, at best, poor performance, and can cause 
damage to the vacuum motor, control, and personnel. 
3-3 Necessary 
Tools 
;
  Hand drill 
;
  Pop-rivet gun 
;
 
3
/
16
” (about 4.8 mm) -diameter rivets 
 
3-4  Mounting SSL/CSL and SSIL/CSIL Hopper Loaders 
You can mount your SSL/CSL or SSIL/CSIL hopper loader directly to the processing machine 
by cutting a hole in the machine bin lid and fastening the hopper loader to it. The hopper 
loader mounting flange mates with the equipment and uses the same mounting holes as 
previous models.