Справочник Пользователя для Lennox International Inc. GWB9-075IH-2

Скачать
Страница из 56
4
Installation shall conform to requirements of author-
ity having jurisdiction or in absence of such require-
ments:
• United States 
•  National Fuel Gas Code, ANSI Z223.1/NFPA 54. 
•  National Electrical Code, NFPA 70.
• Canada 
• Natural Gas and Propane Installation Code, CAN/CSA 
B149.1.
• Canadian Electrical Code, Part I, Safety Standard for 
Electrical Installations, CSA C22.1
Where required by authority having  jurisdiction,  
installation shall conform to Standard for Controls 
and Safety Devices for Automatically Fired Boilers, 
ANSI/ASME CSD-1. 
Additional manual reset low water cutoff and/or manual 
reset high limit may be required.
Requirements for Commonwealth of 
Massachusetts: 
Boiler installation must conform to Commonwealth of 
Massachusetts code 248 CMR which includes but is not 
limited to:
• Installation by licensed plumber or gas fi tter.
Installers - Follow local regulations with respect to 
installation of CO (Carbon Monoxide) Detectors. Follow 
maintenance recommendations “Maintenance And Cleaning” 
on page 45 .
NOTICE
Used to address practices not related to personal 
injury.
CAUTION
Indicates a hazardous situation which, if not avoided, 
could result in minor or moderate injury.
!
!
  
 WARNING
Indicates a hazardous situation which, if not avoided, 
could result in death or serious injury.
!
  
DANGER
Indicates a hazardous situation which, if not avoided, 
WILL result in death or serious injury
!
  
This is the safety alert symbol.  Symbol alerts you to      
This is the safety alert symbol.  Symbol alerts you to      
potential personal injury hazards. Obey all safety messages 
potential personal injury hazards. Obey all safety messages 
following this symbol to avoid possible injury or death.
following this symbol to avoid possible injury or death.
Become familiar with symbols identifying
Become familiar with symbols identifying
potential hazards.
potential hazards.
General
Boiler installation shall be completed by qualifi ed agency.  
See glossary for additional information.
 WARNING
Fire, explosion, asphyxiation and electrical shock 
hazard.  Improper installation could result in death 
or serious injury.  Read this manual and understand 
all requirements before beginning installation.
!
  
IMPORTANT SAFETY INFORMATION
Keep this manual near boiler
Retain for future reference