3M 78-8135-4385-3-A 用户手册

下载
页码 28
 
16
 
78-8135-4385-3-A
15.0  Crimping and Boot Placement for 3 mm 
Jacketed Fiber
15.1  Remove connector from load adapter
15.2  Slide metal crimp sleeve down and over aramid yarn. 
It should rest over the metal strength sheath as shown.
15.3  Using the LC die labeled “A” with the 3M lettering 
facing left, crimp the left half of the the crimp ring 
once making sure that the 3M lettered side of the die 
is flush with the connector prior to crimping.
Note: The crimp ring must be flush against the connector 
prior to crimping. The 3M-lettered side of the crimp die 
should be touching the rear of the connector.
15.4  Using the LC die labeled “B” line up the non-lettered 
side of the die with the rear of the crimp die and crimp 
the right half of the crimp ring. 
 
The completed 3 mm crimp shold look like this:
Hex