Toshiba CTX28 用户手册

下载
页码 495
Strata CTX100-S/CTX100 Installation
Installing the CTX100 Cabinet
3-10
Strata CTX I&M    06/04
Figure 3-7
Base and Expansion Cabinet Interior
Step 14: Install Reserve Power
Skip this step if you are not going to install reserve power batteries.
A reserve power source (two or four customer supplied 12VDC batteries) can be connected to the 
CTX100 power supply equipped with an ABCS battery charger to ensure uninterrupted system 
operation in the event of a power failure. The ABCS battery charger and a pre-assembled battery 
cable (ABTC-3M) for connecting the batteries is available from Toshiba (see 
). 
Figure 3-8
CTX100 Power Supply (Top view)
Flip open locks to plug in data cable. 
Push locks closed once cable is 
plugged in. Make sure locks are 
closed. 
Left side of Expansion Cabinet fits 
over the right side of the Base 
Cabinet. 
S101 S102 S103 S104 S105 S106 S107 S108
5969
2 - Screws
Four-Wire Plug 
Power Supply Four-Prong 
Connector (CN-501) 
ABCS1A
5970