Amtrol HM-41L 用户手册

下载
页码 12
-4-
4. HYDROMAX
 Plumbing
DOMESTIC WATER PIPING
1. Connect the cold water supply to the pipe labeled 
 
COLD WATER.
2. Connect the HOT WATER piping to the domestic hot 
 
water system.
3. When all domestic water piping is complete, open the cold water 
supply and allow some water to enter the tank.  Look and listen 
for signs of leaks and repair as necessary before continuing.
Note: If installing on a city supply, a properly sized thermal expansion 
tank is required and should be installed in accordance with the 
product installation manual.
Note: If a water heater is installed in a closed water supply system, 
such as one having a back-flow preventer in the cold water supply, 
means shall be provided to control thermal expansion. Contact 
the water supplier or local plumbing inspector on how to control  
this situation.
Note: If an external electrical source is utilized, the appliance, when 
installed,must be electrically grounded in accordance with local 
codes or, in the absence of local codes, with the National Electrical 
Code, ANSI/NFPA 70.
Note: The thermostat is adjusted to 120° F, when shipped from  
the factory.
4. Install the blowdown tube on the T&P relief valve outlet.  
Plumb to within 6 inches above a floor drain or as directed by  
plumbing code.
Do not drill, puncture or otherwise 
penetrate the steel outer tank shell. 
Do not screw pipe hangers or other hardware into the 
exterior of the tank.
BOILER PIPING
1.  Plumb the circulator or zone valve on the BOILER 
 
SUPPLY line.
2.  Pipe the BOILER RETURN connection to the boiler return line.
Be sure the return line is NOT 
plumbed to the suction side of any 
heating circulators.  This may require moving the heating 
circulator off the boiler tapping on packaged boilers.  
Failure to do so will result in overheating and tank 
damage when the heating system is in operation.
3. Install a weighted flow check on the boiler return line.  This is 
not necessary on systems utilizing a zone valve to control the 
water heater temperature.
4. After completing the boiler piping, slowly open the boiler fill 
valve and pressurize the water heater loop.  Check for leaks 
and repair as necessary. Proceed to the appropriate wiring 
section in this manual.
 
EXPLOSION HAZARD. Do not install to 
a high pressure steam boiler (greater 
than 15 psig). An explosion could occur.
LEFT SIDE . . . . . . . . . . . 1"
RIGHT SIDE. . . . . . . . . . 1"
TOP  . . . . . . . . . . . . . . . . 9"
REAR . . . . . . . . . . . . . . . 1"
FLOOR. . . . . . . . . . . . . . 0"
FRONT. . . . . . . . . . . . . . 1"
Clearance From Combustible Surfaces
LEFT. . . . . . . . . . . . . . . 12"
RIGHT  . . . . . . . . . . . . . 12"
FRONT. . . . . . . . . . . . . 30"
HEAD ROOM. . . . . . . 36"
REAR . . . . . . . . . . . . . . 1"
Recommended Clearance for Servicing
PIPING USING ZONE VALVE
REAR VIEW
(FOR CLARITY)
DRAIN
BLOWDOWN 
TUBE
TOP VIEW
FROM FRONT
WIRING AND AQUASTAT
ON FRONT CAP HALF
BOILER RETURN
BOILER SUPPLY
TEMPERATURE
SENSOR WELL
HOT WATER
OUTLET
COLD WATER
SUPPLY