Lucent Technologies Release 6 用户手册

下载
页码 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Install and Wire Telephones and Other Equipment 
Page 5-97
Add External Modem to TN1648B 
5
Cabinet Preparation
1. Open the front door.
NOTE:
Administration may be required before removing the circuit pack in 
the following step.
2. Determine which slot will contain the new circuit pack. Remove the circuit 
pack or the apparatus blank from this slot. 
3. Install the new circuit pack.
4. From the front, remove the fan cover. See 
Table 5-19.
Quantity
Description
Comcode
1
Pass-thru Tool 
847978715
1
Panel Adapter Bracket
---------------
1
Cable Assembly
---------------
10
Cable Ties 
407814672
6
Cable Tie Mounts 
403053150