Lucent Technologies Release 6 用户手册

下载
页码 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Install and Connect Cabinets 
Page 1-14
Connect AC Power and Ground 
1
Large Battery Holdover
When using large battery holdover, 1 battery cabinet is required for every system 
cabinet requiring holdover. The 24-cell battery cabinet must have a float voltage 
of 54.2 VDC. 
1. Connect the -48 VDC cable to the large battery connector. See 
2. Connect the -48 VDC RETURN cable to the ground terminal block.
3. Connect the temperature sensor cable, from the battery cabinet, to J20.
NOTE:
An adapter cable may be required when connecting the temperature 
sensor cable to the J58890CH unit. See 
Table 1-4
Connect Shorting Cable to J58890CE-2
!
CAUTION:
For a cabinet with a battery charger, read the caution label on the 397C 
battery charger before disconnecting batteries.
Some cabinets contain a J58890CE-2 AC Power Distribution Unit without an 
optional battery charger. Install the shorting cable only when a battery charger is 
not
 installed.
Table 1-4.
Temperature Sensor Cable Adapter Cables
H600-476 Adapter Cable
Usage
Group 1 (G1)
24-cell customer-provided battery
Group 3 (G3) (included 
with battery cabinet)
24-cell Lucent Technologies battery