DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Test Telephones and Other Equipment 
Page 6-8
Perform Complete System Test 
6
Verify Timing to the System 
1. Administer the Stratum 3 clock by issuing the change synchronization 
command at the management terminal.
2. Enter a 3 in the 
stratum
 field.
3. Type the port network number where the TN780 Tone-Clock circuit packs 
reside in the 
port network
 field.
NOTE:
Wait 1 minute for the software to reconfigure the system 
synchronization.
4. Verify the results of test 649. If test 649 fails with a code of 2101, then 
check the wiring for EXTSYN0 and EXTSYN1. Refer to 
DEFINITY 
Enterprise Communications Server Release 6 Maintenance for R6r
.
5. If test 649 is successful, then the system is getting correct timing from the 
Stratum 3 clock.
Perform Complete System Test
Run the complete system test with the “Allports” option in the “SPE Interchange” 
and “Long Test” modes. The hardware group tests are described in 
DEFINITY
 
Enterprise Communications Server Release 6 Maintenance for R6r 
or 
DEFINITY 
Enterprise Communications Server Release 6 Maintenance for R6vs/si
.
NOTE:
This test takes several hours. It may be best to run the test in the 
background, or at night, or both.
Resolve Alarms
After the test has completed, inspect the alarms log. Type display alarms and 
resolve the alarms in the usual manner.
Check the error log for evidence of failure. The only failure results logged should 
be the outcome of tests requiring a connected station, where a station is not 
connected to the port under test. Repair all other failures or refer them to a 
maintenance technician for repair.
Resolve any alarms that may exist using 
DEFINITY Enterprise Communications 
Server Release 6 Maintenance for R6r