Parallel Compressor Systems
Warning:   It is illegal to knowingly vent or discharge 
any CFC’s and HCFC’s to the atmosphere. 
ALL CFC’s and HCFC’s must be reclaimed 
or recycled.
Leak Check
1.   To check the systems for leaks, leave all valves closed on 
suction, liquid and hot gas manifolds. The unit is shipped 
with a holding charge of dry nitrogen and should be leak 
free. Build up the pressure in each circuit to a maximum of 
150 psig dry nitrogen and check each individual circuit.
2.   After  each  circuit  has  been  checked,  open  all  valves 
to allow the pressure into the unit assembly. Check to 
be  sure pressure is throughout the assembly. Check all 
connections and accessories for leaks.
Evacuation
1.   After the system is leak checked, connect a good high 
vacuum pump with fresh oil to both the low and high 
side evacuation valves. Connections between the pump 
and  evacuation  valves  should  be  made  with  copper 
tubing or high vacuum hose having a diameter of at least 
3/8”. Evacuate the system to 1500 microns for the first 
evacuation. 
2.   After each evacuation, the vacuum should be broken by the 
introduction of refrigerant into the system. The refrigerant 
should  be  passed  through  a  drier  when  breaking  the 
vacuum until the pressure is brought up to 0 psig.
3.   Between  the  first  and  second  evacuation,  the  liquid 
filter driers and suction filters should be installed in each 
replaceable core shell. 
4.   A triple evacuation is recommended. The third and final 
evacuation should achieve a value of 500 microns or less. 
After this vacuum is reached, add as much refrigerant as 
possible into the receiver. Now the system is ready to be 
started.
Start-up
1.   Set all pressure controls as recommended elsewhere in this 
manual. Recheck all service valves and shut-off valves to 
be sure they are open. 
2.   Check and be sure the condenser fan motors are running 
in the correct rotation. 
3.   All evaporator fan motors should be checked for proper 
rotation. The fans in low temperature boxes generally have 
a fan delay for defrost purposes that keep the fans from 
operating until the evaporator coil has reached a certain 
temperature.  It  will  be  necessary  to  jump-out  the  fan 
controls on freezer units to make them run through final 
charging and room temperature pull-down. The wiring 
diagram for the unit will have to be consulted to determine 
how to best force the fans to operate for this step.
4.   With  all  compressor  and  control  breakers  and  toggle 
switches turned off, apply power to the unit. If the unit is 
using a phase monitor, the green light must come on before 
going any further. (See instructions for phase protector 
elsewhere in this manual.) A red light indicates incorrect 
phasing or voltage. Check with a volt meter to see if correct 
voltage is connected to the unit. Correct the Power Supply 
before proceeding.
5.   Turn on the circuit breaker for the control power. If an 
electronic control system is installed on the unit, it will 
initiate at this time. The Heatcraft preferred controller is 
manufactured by Computer Process Control (CPC). Review 
the manual for the controller supplied with the system.
6.   Turn on circuit breakers to all compressors. The compressors 
can  be  started  by  turning  on  the  compressor  toggle 
switches. Likewise, each circuit control can be started by 
turning on the circuit toggle switch. It is recommended that 
one compressor at a time be started and checked before 
allowing them all to operate. It is also advisable to check 
one circuit at a time to be certain all components work 
when called upon and that the circuit wiring is correct.
7.   When each circuit and compressor has been tested and 
the appropriate amount of refrigerant has been added for 
proper operation, allow the system to operate and pull-
down the room/fixture temperatures. 
8.   Once the system is operating, set all regulating valves.
9.   When  the  room  and/or  the  fixture  temperatures  are 
at  design,  the  expansion  valves  should  be  set.  (See 
instructions elsewhere in this manual.)
10.   Adjust  the  electronic  or  manual  pressure  controls 
as  necessary  to  maintain  proper  pressures  and 
temperatures.
11.   Check the refrigerant level in the receiver. The minimum 
level that should be maintained is 20%.
12.   All circuit defrost controls must be set and checked. Again, 
one circuit at a time should be tested.
13.  Set condenser fan controls to maintain the proper discharge 
pressure.
14.   All safety controls should be checked and verified. Check 
that the alarm circuitry is operating at this time. 
15.   Check the oil reservoir during the start-up and add oil as 
necessary. The oil level should be between the upper and 
lower reservoir sight glass. Do not add more than two 
gallons of oil to a system. If more oil is needed, recheck the 
piping as oil is not returning to the unit properly.
Leak Checking, Evacuation and Start-up