3M 800rf 用户手册

下载
页码 170
11 - SET UP AND ADJUSTMENTS
30 
2012 March
800rf-NA
11.1  Tape Loading on the Top Unit
Insert a tape roll on the drum and push it fully forward. 
Attach the tape leg to the threading tool (supplied with 
the tools kit)  Figure 11-1. 
Insert the plastic threading leader through the taping 
unit. Take care to keep hands away from the tape 
cutting blades (Figure 11-2 and 11-3). 
Follow the path through the unit as shown on picture 
(Figure 11-4) 
and make sure that the adhesive side is 
placed on the correct side.
Pull and cut off the excess tape using a pair of 
scissors as shown (Figure 11-5 and 11-6). 
Figure 11-1
Figure 11-2
Figure 11-5
Figure 11-6
 Adhesive
 Adhesive
Figure 11-3
 Adhesive
 Adhesive
 Adhesive
 Adhesive
Figure 11-4