Emerson 200I/48-NT5C05C 用户手册
Installation 21
Emerson Energy Systems
Rectifier 200I/48
NT5C05C Installation and User Manual
in the concrete floor, the secondary anchor locations may be used. An
optional cabinet isolation kit is available consisting of four anchor
bushings and a base pad. If this kit is installed, place the pad on the floor
and the bushings on the anchors, and position the cabinet on top.
optional cabinet isolation kit is available consisting of four anchor
bushings and a base pad. If this kit is installed, place the pad on the floor
and the bushings on the anchors, and position the cabinet on top.
Figure 3 - Anchoring the cabinet
+
+
600 mm
(23.56 po.)
520
m
m
(20.
42
po.)
5
9
0
m
m
(2
3
.1
3
p
o
.)
526 mm
(20.68 po.)
SECONDARY LOCATION
FOR FLOOR ANCHORS
PRIMARY LOCATION
FOR FLOOR ANCHORS
Procedure 2 - Installing a rectifier in a cabinet
Step Action
1
Loosen and remove the screws securing the mounting brackets to
each side of the rectifier.
each side of the rectifier.
2
Reposition and secure the mounting brackets to the holes located
nearest the front of the rectifier, on each side of the rectifier.
nearest the front of the rectifier, on each side of the rectifier.
3
Remove the blank panel from the cabinet and put the self tapping
screws in a secure location, for future use.
screws in a secure location, for future use.
continued