3M 800a3 用户手册

下载
页码 130
16 
2011 September
800a3-NA 
6.1  Uncrating
The envelope attached to the shipping box contains 
the uncrating instructions of the machine 
(Figure 6-1).
Cut straps. Cut out staple positions along the bottom 
of the shipping box (or remove staples with an 
appropriate tool
 - Figure 6-2).
After cutting out or removing the staples, lift the 
shipping box in order to clear the machine 
(two persons required).
Transport the machine with a fork-lift truck to the 
operating position.  Lift the pallet at the point indicat-
ed in 
Figure 6-3 (weight of machine + pallet = See 
Specifi cations).
6.2  Disposal of Packaging Materials 
The 800a3 package is composed of:
-  Wooden pallet
-  Cardboard shipping box
-  Wooden supports
-  Metal fi xing brackets
-  PU foam protection
-  PP plastic straps
-  Dehydrating salts in bag
-  Special bag of laminated polyester/aluminium/
   Polyethylene (sea freight package only)
-  Polyethylene protective material 
For the disposal of the above materials, please follow 
the environmental directives or the law in your country.
6-UNPACKING
Figure 6-1
Figure 6-2
Figure 6-5
Removal of Pallet
Loosen and remove nuts and brackets using the 
open end spanner supplied in the tool box 
(Figure 6-4).
A cardboard box is located under the machine body. 
Retrieve the instruction manual for additional proce-
dures of the set up. The box also contains parts re-
moved for shipping, spare parts and tools 
(Figure 6-5).
  Figure 6-4
Figure 6-3