Bosch Appliances Computer Hardware DVA-08K 用户手册

下载
页码 68
40
en | Subsystem Connection and Operation
RAID Subsystem DVA-08K | Installation Manual
F.01U.027.797 | V2 | 2008.08
Bosch Security Systems
This screen appears when the PSUs are turned 
on.
 
Proceeding with controller self-test.
Self-test completed. 
Verifying installed cache memory.
System is ready. You can now start to config-
ure the subsystem.
DVA-08K
DVA-08K