Enterasys Networks 7S4280-19-SYS 用户手册

下载
页码 108
Overview of the NAC Controller PEP Shutdown Procedure
5-6 Troubleshooting
Overview of the NAC Controller PEP Shutdown Procedure
The chassis must shut down in an orderly fashion to ensure that the other devices on the network 
are notified of the impending change. The devices can then make intelligent decisions and 
stabilize the network before the change is made; thereby increasing network availability.
You can shut down a NAC Controller PEP in an operating N1 Chassis using the 
OFFLINE/RESET 
switch
 shown in 
. There are two procedures to shut down a chassis.
Figure 5-2  OFFLINE/RESET Switch for the 2S4082-25
Figure 5-2  OFFLINE/RESET Switch for the 7S4280-19
Caution: Do not remove a NAC Controller PEP from an operating chassis system before reading 
the following information and instructions.
Precaución: Antes de retirar los módulos DFE del chasis en funcionamiento, lea las siguientes 
instrucciones y la información suministrada.
OFFLINE/RESET switch
OFFLINE/RESET switch