Viking FDRB5303R 安装指南

下载
页码 48
44
Performance Checklist
 Verify cabinet size.
 Verify electrical supply and water supply 
(if applicable).
 Install anti-tip device(s) and verify unit is
secure.
 Position unit in cutout, level at desired
height and secure unit.
 Plug-in unit and verify operation.
 Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation 
(if applicable).
 Align/square door(s).
 Verify drain pan is properly installed and
there are no leaks on water connection.
 Install kickplate.
 Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s name:
_____________________________
Installer’s company:
_________________________
Date:
________________________________________