Servis-Rhino 1900 Benutzerhandbuch

Seite von 154
OPERATION
1900   07/10
Operation Section 4-19
© 2010 Alamo Group Inc.
OPERA
T
ION
7. MACHINE CONTROLS
7.1 Cable Controlled Models Only
7.2 Lever Functions
Slew - 
Allows Slew working
Auto Reset- 
Allows normal working