Lifebreath 1000RHCAC Benutzerhandbuch

Seite von 26
* LEAVE FOR HOMEOWNER
NOTE:  Due to ongoing research and product development, specifications,     
ratings and dimensions are subject to change without notice.
OPERATION AND 
INSTALLATION MANUAL
NOTE: ALTHOUGH SOME MODELS
DIFFER IN OPERATION, THE BASIC
STEPS ARE SIMILAR.
CAUTION
Before installation, careful consideration must be
given to how the system will operate if connected to
any other piece of mechanical equipment, i.e. a forced
air furnace or air handler, operating at a higher static.
After installation, the compatibility of the two pieces of
equipment  must be confirmed, by measuring the 
airflow’s of the Heat/Energy Recovery Ventilator
(HRV), by using the balancing procedure in 
this manual.
It is always important to assess how the operation 
of any HRV may interact with vented combustion
equipment (ie. Gas Furnaces, Oil Furnaces, Wood
Stoves, etc.).
NEVER install an HRV in a situation where its normal
operation, lack of operation or partial failure may result
in the backdrafting or improper functioning of vented
combustion equipment!!!
TI-81C
1203
Installing Contractor
Telephone / Contact
Serial Number
Installation Date
Model
TO BE COMPLETED BY CONTRACTOR AFTER INSTALLATION
For Models: 
700DDPOOL 
1200DDPOOL
1000RHC
1000RHCAC