Lifebreath 1200FD/DD Benutzerhandbuch

Seite von 31
* LEAVE FOR HOMEOWNER
NOTE:  Due to ongoing research and product development, specifications,     
ratings and dimensions are subject to change without notice.
OPERATION AND 
INSTALLATION MANUAL
®
C L E A N   •   F R E S H   •   A I R
NOTE: ALTHOUGH SOME MODELS
DIFFER IN OPERATION, THE BASIC
STEPS ARE SIMILAR.
CAUTION
Before installation, careful consideration must be given to
how the system will operate if connected to any other piece
of mechanical equipment, i.e. a forced air furnace or air
handler, operating at a higher static. After installation, the
compatibility of the two pieces of equipment must be 
confirmed, by measuring the airflow’s of the Heat/Energy
Recovery Ventilator (HRV/ERV), by using the balancing
procedure in this manual.
It is always important to assess how the operation of any
HRV/ERV may interact with vented combustion equipment
(ie. Gas Furnaces, Oil Furnaces, Wood Stoves, etc.).
NEVER
install an HRV/ERV in a situation where its normal
operation, lack of operation or partial failure may result 
in the backdrafting or improper functioning of vented 
combustion equipment!!!
TI-72C-NE
0105
Installing Contractor
Telephone / Contact
Serial Number
Installation Date
Model
TO BE COMPLETED BY CONTRACTOR AFTER INSTALLATION
For Models: 
500DCS 
ControlAir 15
850FD/DD
Analog Controls
700FD/DD 
Analog Controls
1200FD/DD 
Analog Controls
500ERV 
ControlAir 15
700ERV 
Analog Controls
1200ERV 
Analog Controls