Remington QFP40 Benutzerhandbuch

Seite von 68
REMINGTON QFP40 Direct Vent FIREPLACE
Page 36
250-4721   JUNE 2001
HORIZONTAL INSTALLATION (CONT.)
Step 4. Position the horizontal vent termination in the center of the 10" (254mm) square hole, run a
bead of non-hardening mastic around its outside edges, so as to make a seal between it and
the wall,  attach termination cap to the exterior wall with the four wood screws provided. The
arrow  on  the  vent  cap  should  be  pointing  up  (Figure  7)  .  Insure  that  proper  clearances  to
combustible materials are maintained.
NOTE:
(1)
The  four  wood  screws  provided  should  be  replaced  with  appropriate  fasteners  for  stucco,
brick, concrete, or other types of sidings.
(2)
If you are using Simpson DuraVent termination cap # 985 on a building with vinyl siding, a
vinyl siding standoff (Simpson Dura-Vent Part #950), should be installed between the vent
cap  and  the  exterior  wall  (Figure  8). Attach  the  vinyl  siding  standoff  to  the  horizontal  vent
termination. The vinyl siding standoff prevents excessive heat from possibly melting the vinyl
siding material. Vent terminal shall not be recessed into a wall or siding.  Remove siding
from beneath area of standoff.
HOT
VENTING
FIG. 7
FIG. 8
WOOD  SCREW
PART #985 OR
HHW2
VINYL SIDING
APPLY  SEALANT
ALL FOUR SIDES
BOLT HORIZONTAL TOP
TO VINYL STANDOFF
VINYL SIDING STANDOFF w/
SIDING  BENEATH  REMOVED
SCREWS