GN National Electric PV-28SV50 Benutzerhandbuch

Seite von 48
22618-4-1106
Page 27
OPERATING INSTRUCTIONS CHECKLIST
BEFORE OPERATING THIS APPLIANCE, CAREFULLY PROCEED THROUGH THE FOLLOWING 
CHECKLIST
1.  Read and understand these instructions before installing or 
operating this appliance.
2.  This appliance is should be installed and repaired by a fully 
qualified service person who must be familiar with the instal-
lation of the Mantis Power-Vent High-Efficiency Fireplace.
3.  Installers who are not familiar with the installation of this ap-
pliance should contact Empire Comfort Systems, Inc. prior to 
installing the appliance to avoid creating hazardous operating 
conditions.
4.  Check and inspect the appliance for gas leaks. In the event 
of gas leaks, cut off the gas supply to the heater immediately  
and call your gas supplier or installer.
5.  Check and verify that all flue venting combustion air intakes 
and flue outlets are unobstructed.
6.  Refer to pages 19 to 22 for Single Flue pipe and pages 23 
to 25 for Co-axial Flue installations. Check that correct flue 
pipe and cap has been fitted in line with the manufacturer’s 
specifications as illustrated in this manual pages 11 to 25.
7.  Do not use alternative Flue or cap on installation other than 
that specified in this manual - otherwise heater will malfunc-
tion and cause hazardous operating conditions and will void 
the manufacturer’s warranty.
8.  Check and verify that flue pipe connection to the appliance 
when  using  single  1  1/2”  flue  pipe  installation  is  correctly 
installed and secured in line with instruction in this manual,  
Pages 19 to 22.
9.  Prior to operating the appliance, check for dust or debris on 
the burners. Refer to Page 37, Figure 47.
10.  Check and verify that logs are place correctly as per instruc-
tions on Pages 16 to 17 of this manual. If logs are incorrectly 
positioned, it can create a hazardous situation, and in most 
instances, the heater will not operate correctly.
11.  Do not light heater without logs installed, as heater will not 
operate properly.
12.  Check and verify prior to starting the appliance, that all panels 
are secured in place and that the main door has been locked in 
position.
13.  After verifying and checking all the above points, proceed to 
lighting instructions. Refer to pages 28 to 29.