American Power Conversion DX Benutzerhandbuch

Seite von 96
15
NetworkAIR FM DX 60 Hz Operation, Maintenance, and Troubleshooting
Final Inspection Checklist
\
Owner Acceptance
To ensure proper unit operation and trouble free operation the following procedures must be completed 
and filed with the customer for future reference.
•  Review installation of the equipment. Verify that installation is in compliance with Installation 
manual instructions/recommendations.
•  Complete start-up checklist and file with owner and factory to activate warranty policy.
•  Train personnel responsible for maintenance and minor adjustments to temperature & humidity 
set points.
•  Recommend spare parts for the owner to keep on hand, especially for critical operation 
installations.
•  Offer a list of contacts for service, technical assistance, replacement parts.
Ensure that:
The system interior and exterior are clean and free from debris.
Installed options (smoke detectors, firestat, water detector, remote sensor, remote relay shutdown, dry 
contact alarm, essential/non-essential lockout, Redundant Unit Group control, condensate pump, etc.) 
are operating correctly.
Setpoints and deadbands are set.
Packaging materials are disposed of properly.
You have sent the start-up form to APC.