Honeywell L7248A Benutzerhandbuch

Seite von 16
L7224A,C; L7248A,C,L OIL AND ELECTRIC BOILER ELECTRONIC AQUASTAT
®
 CONTROLLERS
3
68-0281—16
New Installation
Order well assemblies separately; see Table 1 and form 
no. 68-0040, Immersion Wells and Compression Fittings 
for Temperature Controllers. Boilers usually have tappings 
that allow the well to be mounted horizontally so boiler 
water of average temperature can circulate freely over the 
well.
1. Turn off all power and drain the boiler, if applicable.
2. If no tapping is provided, prepare properly sized and 
threaded tapping near the top of the boiler.
3. Sparingly coat the well threads with pipe dope.
NOTE: Do not attempt to tighten by using the case 
as a handle.
4. Install the well in the boiler tapping and tighten 
securely.
5. Refill boiler and check for water leakage.
6. Loosen but do not remove the well clamp screw.
7. Fit the case into the well so the clamp on the case 
slides over the flange on the well.
8. Securely tighten the clamp screw.
9. Insert the sensor element into the well until it bot-
toms. See Replacement Sensor Installation section 
for details. (If necessary, slightly bend the wire 
inside the case to hold the sensor against the bot-
tom of the well.)
10. Turn power ON.
11. Set High Limit, Low Limit and Low Limit Differential 
to the settings recommended by the boiler OEM. 
(See OPERATION section.) (See INSTALLATION 
steps 6 and 7.)
12. On L7248L models, adjust ELL option to match your 
configuration (see OPERATION section, and Fig. 11 
IMPORTANT
Best thermal response is obtained with a well 
that snugly fits the sensor. Insert the sensor until 
it rests against the bottom of the well. Use a well 
of correct length and bend the wiring, if neces-
sary, to hold the bulb against the bottom of the 
well.
If the well is not a snug fit on the sensor, use the 
heat-conductive compound (furnished with 
TRADELINE
®
 models) as follows: Fold the 
plastic bag of compound lengthwise and twist it 
gently. Then snip off end of bag and work the 
open end of the bag all the way into the well. 
Slowly pull out the bag while squeezing it firmly 
to distribute compound evenly in the well. Bend 
the wiring, if necessary, to hold the sensor 
against the bottom of the well and to hold outer 
end of the sensor in firm contact with the side of 
the well. See Fig. 2. Wipe excess compound 
from the outer end of the well.
Fig. 2. Position of sensor in immersion well.
Flush-Mounted Aquastat 
Replacement
Turn off all power and remove the old control. Refer to the 
cover insert of the old control to identify and tag each 
external lead as it is disconnected. If the old well is 
unsuitable for the new installation, remove it and replace it 
with a suitable new well. If the old well is suitable, use it.
Well-Mounted Aquastat 
Replacement
Turn off all power and remove the old control. Refer to the 
cover insert of the old control to identify and tag each 
external lead as it is disconnected. If the old well is 
unsuitable for the new installation, remove it and proceed 
with instructions for new installation. If the old well is 
suitable, use it. 
1. Loosen, but do not remove, the well clamp screw on 
the side of the control case. 
2. Position immersion well clamp snugly over the 
flange of the adapter and tighten the clamp screw.
3. Insert the sensor into the well as shown in Fig. 2 or 
3. (See Replacement Sensor Installation section for 
details.)
Fig. 3. Circuit board, showing sensor connection and 
well holes for horizontal mount models.
SENSOR WIRES
IMMERSION WELL 
CLAMP SCREW
IMMERSION
WELL CLAMP
M16120
HEAT-CONDUCTIVE COMPOUND
(OPTIONAL)
CONTROLLER CASE
BOILER
IMMERSION 
WELL
SENSOR
C1
B1
ZC
L2
LINE
C2
ZR
L1
B2
T
T3
2
1
THERMOSTAT
TERMINALS
ENVIRACOM
TM
TERMINALS
SENSOR HOLES
FUSE
M32186
SENSOR
CONNECTOR
DISPLAY