New Buck Corporation FS 21 Benutzerhandbuch

Seite von 33
Page 14 
 
OUT SIDE AIR INSTALLATION 
 
 
Select an installation location that will give the best airflow from the front of  
the heater to the remainder of the home. 
TOOLS FOR INSTALLATION 
Drop cloth; 3/32" Metal drill bit; 5/16" magnetic socket chuck adapter; 5/16" wrench (box or socket) or adjustable 
wrench; Jigsaw with masonry, metal and wood blades 
 
 
 
 
 
1.  Remove the protective plastic wrapping from the unit, inspect the unit for any obvious physical damage. 
2.  Plug the power cord into a 115V AC outlet to test the  motor and fan when optional motor is being used. “Do 
not run power cord under unit or in high traffic areas”. Unplug power cord  when installing or moving unit. 
3.  Check the primary air draft control to ensure that it  slides freely.(See Figure 10). 
4.  Remove any items from within the firebox. Spread a dropcloth on the floor behind the heater, tilt the heater so 
that the back is on the drop cloth. 
5.  Take a large flat screwdriver or pliers and remove the Two (2)  2" x 2" knockouts, one on bottom of pedestal 
also one located inside pedestal on outer bottom of stove . (See Figure 10). 
6.  Stand heater upright and place it on the pad making sure the minimum clearance specifications are met. (See 
Pages  10,12). 
7.  Lightly mark with a pencil the location of the pedestal on the protective pad. Open ash door and locate two 
holes in bottom of base for securing the pedestal to pad and floor and mark holes location on pad.(See Figure 
10A). Place heater out of the way of the installation area. 
8.  Now use a 3/8" masonry bit and drill two (2) holes in the protective pad for securing the pedestal to pad. Be 
careful to drill only through the pad and not into the floor.  Change the bit to a 1/4" metal bit and drill through 
the floor. (See Figure 10A). 
9.  Hole for outside air tube may be located anywhere under pedestal base. Cut a 4-1/4"diameter hole in the pad 
and continue through the floor. (See Figure 10A). 
10. Obtain the outside air duct from the box and slip the duct down through the  4-1/4"  hole until the face of the 
outside air duct with screen wire contacts the pad. Secure the outside air duct to the pad using the four (4) 
#10x1 screws provided.  (See Page 13, Figure 10B). 
11. Now, reposition the heater and set on the pad being sure to line the stand up with the reference marks. Using 
the four (2) 3/8" x 1-1/2" lag bolts  provided, secure the heater and pad to the floor of the home. 
 
 
 
 
12. NOTE: If home is underpinned, you must run duct through underpin as shown. (See Page 15, Figure 10C). 
4 1/4’  HOLE  
TWO ( 2 ) 3/8"  HOLES 
PROTECTIVE PAD 
Figure 10A
 
 
 
 
KNOCKOUTS 
HOLES FOR  
SECURING  
 PEDESTAL 
Figure 10
DRAFT  
CONTROL 
PEDESTAL 
CAUTION
 
THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR MUST BE MAINTAINED.   
 (MOVEOPENING AND/OR REPOSITION  HEATER  LOCATION  IF NECESSARY).  
CAUTION
 
IF  A THICK FLOOR PROTECTOR IS USED, YOU MAY HAVE TO  USE  LONGER LAG BOLTS.