Regency F2400M Benutzerhandbuch

Seite von 28
Regency Freestanding Woodstove
11
Horizontal Installation
Standard Ceiling Installation
8)  To complete your chimney installation, install 
the  double  wall  connector  pipe  from  the 
stove’s flue collar to the chimney support 
device.  
9)  If  you  are  using  a  horizontal  connector, 
the chimney connector should be as high 
as possible while still maintaining the 18" 
(457mm) minimum  distance from the hori-
zontal connector to the ceiling.
10) NOTE: Residential Close Clearance and 
Alcove installations require a listed dou-
ble wall connector from the stove collar 
to the ceiling level.
The diagrams below illustrate one way to in-
stall your unit into a standard ceiling or with a 
horizontal  connector.  Check  with  your  dealer 
or  installer  for  information  on  other  options 
available to you.
INSTALLATION
STEP-BY-STEP  
CHIMNEY AND  
CONNECTOR  
INSTALLATION
Note:   These are a generic set of chimney in-
stallation instructions.  Always follow 
the manufacturers own instructions 
explicitly. Verify the Minimum Recom-
mended Heights for Woodstove Flue 
(Table 1 in the Installation section).
1)  With your location already established, cut 
and frame the roof hole. It is recommended 
that no ceiling support member be cut for 
chimney and support box installation. If it is 
necessary to cut them, the members must 
be made structurally sound.
2)  Install  radiant  shield  and  support  from 
above.
3)  Stack  the  insulated  pipe  onto  your  finish 
support to a minimum height of 3 feet above 
the roof penetration, or 2 feet above any 
point within 10 feet measured horizontally.  
There must be at least 3 feet of chimney 
above the roof level.
Note:   Increasing the chimney height above 
this  minimum  level  will  sometimes 
help  your  unit  to  “breathe”  better 
by allowing a greater draft to be cre-
ated.  This greater draft can decrease 
problems such as, difficult start-ups, 
back-smoking  when  door  is  open, 
and dirty glass.  It might be sufficient 
to initially try with the minimum re-
quired height, and then if problems 
do arise  add additional height at a 
later date.
4)   Slide the roof flashing over your chimney 
and seal the flashing to the roof with roofing 
compound.  Secure the flashing to your roof 
with nails or screws.
5)  Place  the  storm  collar  over  the  flashing, 
sealing the joints with a silicone caulking.
6)  Fasten the raincap with spark screens (if 
required) to the top of your chimney.
7)  For optimum efficiency when installing into 
a masonry chimney, size accordingly, i.e.  
the 6" (152mm) flue dia. is  28.28 sq.in. 
Leg and Bottom Shield Assembly
F2400M & S2400M
 
Bottom Shield 
020-911
 
Legs (set of 4)
 
Steel - Painted Black  850-125
 
Cast - Painted Black  850-126
 
Cast - Gold Plated 
850-127
The instructions below apply to the steel leg, 
painted cast leg and the gold plated cast leg. It 
will be easier to attach the legs to the stove if 
the stove is tipped on its back (preferably on a 
soft surface to prevent scratching). Ensure to be 
extremely careful when tipping stove.
1)  Remove the 4 bolts from underside of the 
base  of  the  pedestal  and  discard.    Also 
remove cover plate and put to the side.
2)  Line up the heat shield with the bottom of 
the unit.
3)  Start threading the bolt and washer (supplied 
with the bottom shield) for about 1/4 of the 
way through the leg with the washers being 
underneath the legs.  Ensure that the legs 
are properly aligned with heat shield and 
tighten the bolts.
4)  Level the stove by adjusting the levelling 
bolts in the bottom of each leg.
5)  Reinstall cover plate.
6)  Install logo plate onto heat shield by placing 
in 2 holes as shown in diagram.
If you are installing outside combustion air, bend 
the tabs out 90 degrees. Pipe fresh air into the 
bottom shield by using a minimum 4" duct pipe 
with a mesh grill at the outside termination. At-
tach the pipe to the 2 tabs with screws.