Triarch 31912 Merkblatt

Seite von 1
ASSEMBLY  AND  MOUNTING  INSTRUCTION 
                   
ase read the Assembly lnstr
 
                         For 31912 
Ple
uction sheet carefully before proceeding.Carefully unpack and 
identify all parts prior to building the unit. Each part is identified on the drawing for reference. 
  
ecure the mounting strap to the  ceiling junction  
 ground wire to 
e junction box ground port ; 
TEP 6: Install center pipe and arms to the fixture  
 the fixture,glass 
m   
 
DO NOT DISCARD THE ORIGINAL PACKAGING. If after careful inspection and you must return the item 
for any reason. Please repack the unit using the original carton and inserts. 
 
STEP 1: Unpack all the parts and classify them according to the illustration shown at 
the side.
 
Place the parts on a scratch free surface;
 
 
 
STEP 2: Make sure the power is turned off at the  
junction box where the fixture is to be installed. 
s
box using junction box screws; 
 
STEP 3:Use the wire nuts to connect the positive 
and negative wires .connect the
th
 
STEP 4: Secure the canopy to the ceiling with   
the knurled ring; 
 
STEP 5: lnstall the loop to the colum; 
 
S
with nut and ball nut as shown; 
 
STEP 7: Install the tempered glass by using the   
rubber washer and the cap nut ; 
 
STEP 8: Install the correct bulb (not provided); 
 
STEP 9: Install threaded nipple to
Shade ,glass washer and nut. Secure with botto
ap and finial 
c