Lightolier IS:F302IC Merkblatt

Seite von 1
INSTRUCTION  SHEET
12-01/Rev-02
ISF:302IC
WITH VAPOUR BARRIER COVER: NºVBE300 (Order separately)
1. Select a location for the fixture.
2. Fasten the edge of the vapour barrier cover under the
wood joist. (Fig.1)
3. Install the fixture (see step A, B and C).
4. Install  the  ceiling  vapour  barrier.  (Fig.1)
Note: Seal the edges of the vapour barrier cover and the
vapour barrier. (Fig.2)
FOR NEW CEILING:
A. MOUNTING  BAR:
Note-1:  The mounting  bars  are  extensible  from  12½"  to  29"  max.
Note-2:  For  off-centre  installation,  use  20"  expandable  mounting  bars
(Nº1964,  order  separately).
1. Insert  the  mounting  bars  into  the  proper  openings  on  the  short  side  or  the
long  side  of  the  mounting  frame.  (Fig.4)
2. Align the mounting bar with the bottom edge of the  joist. (Fig.3)
3. Push  in  the  built-in  nailer.  (Fig.3)
B. MOUNTING  FRAME:
1. Install the locking clip. (Fig.5)
Note-1: The locking clip is also available separately
(Nº0098,  order  separately).
Note-2: To lock more securely into place fold the locking tabs. (Fig.4)
C. WIRE-IN:
1. Remove the appropriate "Pry-out plug".
2. Insert  the  supply  lead  into  the  junction  box:
a) If using FLEXIBLE CONDUIT: Use a BX connector (not provided).
b) If using FLEX WIRE: Insert under the wire connector. (Fig.6)
3. Connect the ground lead. (Fig.7,8)
4. Connect  the  white  leads  (NEUTRAL)  together,  and  the  black  leads
(120V)  together. (Fig.7.8)
D. CEILING:
1. Cut a hole in the ceiling (3-3/4” for Model 302 or 4-3/4” for
Model 402), using the mounting frame as a template (if applicable).
(Fig.9)
2. Use the screws to adjust the housing height. Note: Ensure
that the housing is level with the ceiling. (Fig.10)
3. Tighten the screws when completed. (Fig.10)
CAUTION:  The  lampholder  must  not  be  used  for  temporary  lighting,
a protective glass is required for the lamp.
E.
TRIM:
Install the trim using the appropriate sheet.
F. TRANSFORMER  /  REPLACEMENT:
Note: Before performing maintenance on the transformer, make sure that the
electrical supply to the fixture is turned off.
1. Remove the housing and the two screws located inside. (Fig.10)
2. Push down on the spring tab and release the plate. (Fig.11, 12)
3. Remove the plate from the ceiling, disconnect the wiring , and change the
transformer.  (Fig.12)
4. Complete the connections following the wiring diagram (fig.7). Reinstall the
plate onto the spring. (Fig.12)
5. Replace the housing into position. (Fig.10)
INSTALLATION  INSTRUCTIONS  FOR  MOUNTING  FRAME
 FOR  INSULATED CEILING
FIG.3
FIG.4
FIG.5
FIG.6
MOUNTING
FRAME
MOUNTING
BAR
LOCKING
TABS
MOUNTING
BAR
LOCKING
CLIP
MOUNTING
FRAME
"PRY-OUT"
PLUG
FLEXIBLE
WIRE
WIRE
CONNECTOR
JUNCTION
B O X
WOOD  JOIST
FIG.1
FIG.2
VAPOUR
BARRIER  EXTENDER
VAPOUR  BARRIER
VAPOUR  BARRIER
EXTENDER
VAPOUR  BARRIER
SILICONE
SEALER
OR  OTHER
FIXTURE
FIG.7
(MR)
INPUT
(120V)
NEUTRAL  (white)
GROUND
THERMAL
PROTECTOR
LAMP
LOW  VOLTAGE
TANSFORMER
JUNCTION
B O X
WHITE
BALCK
MOUNTING
BAR
BUILT-IN
NAILER
WOOD
JOIST
FIG.9
FIG.10
HOUSING
THERMAL
PROTECTOR
LAMP
INPUT
(120V)
NEUTRAL  (white)
GROUND
WHITE
BLACK
JUNCTION
B O X
FIG.8
(ES)
302ESIC
302MRIC  /  402MRIC
READ  AND  UNDERSTAND  THESE  INSTRUCTIONS  BEFORE  INSTALLING  FIXTURE
This fixture is intended for installation in accordance with National Electrical Code or Canadian Electrical
Code (as applicable) and local regulations. To ensure full compliance with local codes and regulations, check with your local electrical inspector before
installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
SCREWS
FIG.11
FIG.12
T A B
PLATE
SPRING