Lightolier Eye-QLB Merkblatt

Seite von 2
Continuous Row Mounting
• With Fixture on its back, align Coupler holes with
second and third holes in Housing.
• From inside Coupler and Outside Fixture, drive
(2) Screws into First Housing.
• Assemble Stem Sets or Cable Sets.
• For Continuous Row Mounting use Stem Sets or 
Cable Sets at the joints.
• Hang First Fixture and secure Second Fixture with
Coupler and Screws.
• Make wiring connections, install T5/T8 lamps (by
others).
Continuous Row
• For continuous row mounting, remove End Cover.
Preparation
• Rotate Side Reflectors to an open position.
• Remove Louver or Lens Assembly.
• Remove Side Reflectors by removing Tabs
from Slots.
Lightolier
45 INDUSTRIAL WAY, WILMINGTON, MA 01887
INSTALLATION INSTRUCTIONS FOR EYE-QLB LUMINAIRES
1
© a Genlyte company 2005
59-31147-000
Printed in U.S.A.
3
Cable
Set
First
Fixture
Coupler
Screw
Louver
Assembly
(Illustrated)
Side Reflector
End
Cover
Side
Reflector
Tabs/Slots
Stem Set
Second
Fixture
Coupler
First
Fixture
Fixtures shown in hanging position.
Screw
Screw
Screw
Screw
Second Fixture
Screw
Screw
Screw
2
Screw
End
Cover
End
Plate
Housing