American Standard 9532.200 Benutzerhandbuch

Seite von 4
21-1/4"
540mm
7 3 0 5 4 8 - 1 0 0   R e v .   B
-   2   -
C/L of 2 x 6
Reinforcement
Finished
Floor
32-3/4"
Wood Top with Recommended Sinks...
Provide suitable reinforcement required for anchoring the vanity to the wall.  Centerline of reinforcement should be 32-
3/4" up from the floor (see Figure 1).
The molding needs to be notched to seat the vanity flush against the wall (see Figure 2).
Rough in supply lines and waste per rough in dimensions.  
NOTE:  If current supply lines are greater than 6" on center, they may interfere with cutout in rear of vanity or vanity shelf.
Remove the wood top from the vanity. The top is held in place from the underside by 4 screws, 1 through each of the 4 
angled corner braces.
Move the vanity into place and anchor it to the wall through at least 2 of the anchoring holes in the rear of the vanity  (see 
Figure 2).
Continue with installation appropriate for top and sink options chosen.
Two people recommended for this installation
Determine which sink is being installed and follow the instructions printed on the 
appropriate template supplied with vanity.
NOTE:  American Standard is not responsible for cut-out errors when the 
incorrect cut-out template is used.
If Installing:
Use Template:
Sebring 0573  
730541-400
Coventry 0575  
730542-400
After top is replaced, connect the trap to the drain assembly hand tight to check 
alignment.  It may be necessary to cut off part of the tailpiece (area "A") or part 
horizontal leg of the trap (area "B").
Connect hot and cold supply lines to the shut off valves.  Tighten trap joints for 
watertight assembly.
A
B
VANITY INSTALLATION
32-3/4"
832mm
MOLDING
FIGURE 1
FIGURE 2
ANCHORING
HOLES
PAPER TEMPLATE
WOOD VANITY TOP
IMPORTANT: BE SURE TO CENTER SINK
CUT OUT HORIZONTALLY ON VANITY  TOP.