A.O. Smith FMV-50 Benutzerhandbuch

Seite von 32
4
SAFE INSTALLATION, USE AND SERVICE............................2
GENERAL SAFETY..................................................................3
TABLE OF CONTENTS ............................................................4
INTRODUCTION ......................................................................4
 
Preparing for the New Installation .....................................4
TYPICAL INSTALLATIONS .................................................. 5-6
LOCATING THE NEW WATER HEATER .................................7
 
Facts to Consider About Location ................................. 7-8
 
Insulation Blankets ............................................................8 
INSTALLING THE NEW WATER HEATER ........................ 9-18
 
Securing Water Heater to Floor and Wall .........................9
 
T & P Valve and Pipe Insulation ........................................9
 
Water Piping ............................................................... 9-10
 
Water Piping Pressure Test.............................................10
 
Temperature Pressure Relief Valve ...........................10-11
 
Filling the Water Heater .............................................11-12
 
Venting ...................................................................... 12-13
 
Gas Piping ................................................................ 13-14
 
Sediment Traps ...............................................................14
 
White-Rodgers Fuel Conversion Instructions
 
from Natural Gas to Propane (L.P.) Gas ................... 14-16
 
White Rodgers Fuel Conversion Instructions
 
from Propane (L.P.) to Natural Gas .................................16
 
RobertShaw Fuel Conversion Instructions
 
from Propane (L.P.) to Natural Gas ........................... 16-18
 
RobertShaw Fuel Conversion Instructions
 
from Natural Gas to Propane (L.P.) Gas .........................18
WHITE-RODGERS GAS VALVE ............................................19
ROBERTSHAW GAS VALVE .................................................20
INSTATLLATION CHECKLIST ...............................................21
TEMPERATURE REGULATION ............................................22
FOR YOUR INFORMATION ............................................. 23-24
 
Start Up Conditions .........................................................23
 
Operational Conditions ............................................. 23-24
PERIODIC MAINTENANCE ............................................. 25-27
 
Venting System Inspection..............................................25
 
Burner Inspection ............................................................25
 
Burner Cleaning ..............................................................25
 
Housekeeping .................................................................25
 
Anode Rod Inspection.....................................................26
 
Temperature-Pressure Relief Valve Operation ...............26
 
Draining..................................................................... 26-27
 
Drain Valve Washer Replacement ..................................27
 
Service ............................................................................27
LEAKAGE CHECKPOINTS ....................................................28
REPAIR PARTS ................................................................ 29-30
TROUBLESHOOTING GUIDELINES .....................................31
WARRANTY ......................................................................Insert
thank You for purchasing this water heater.  Properly installed and 
maintained, it should give you years of trouble free service.
Abbreviations Found In This Instruction Manual:
•  CSA - Canadian Standards Association
•  ANSI - American National Standards Institute
•  NFPA - National Fire Protection Association
•  ASME - American Society of Mechanical Engineers
•  GAMA - Gas Appliance Manufacturer’s Association
 
This gas-fired water heater is design certified by CSA INTERNATIONAL 
under American  National  Standard/CSA  Standard  for  Gas  Water 
Heaters for Manufactured Home Installation, ANSI Z21.10.1 • CSA 
4.1 (current edition).  
preparInG for the InstallatIon
1.  Read the “General Safety” section, page 3 of this manual first and 
then the entire manual carefully.  If you don’t follow the safety rules, 
the water heater will not operate properly.  It could cause DEATH, 
SERIOUS BODILY INJURY AND/OR PROPERTY DAMAGE.
  This manual contains instructions for the installation, operation, and 
maintenance of the gas-fired water heater. It also contains warnings 
throughout the manual that you must read and be aware of. All warnings 
and all instructions are essential to the proper operation of the water 
heater and your safety. Since we cannot put everything on the first 
few pages, 
read the entIre Manual Before atteMptInG 
to Install or operate the water heater.
2.  Instructions to Manufactured Home Manufacturers:
  The  installation  must  conform  with  the  Manufactured  Home 
Construction and Safety Standards Title 24 CFR, Part 3280. 
Instruction for replacement installation:
  The installation must conform with these instructions and the local 
code authority having jurisdiction. In the absence of local codes, 
installations shall comply with the National Fuel Gas Code ANSI 
Z223.1/NFPA 54, current edition. This publication is available from 
the Canadian Standards Association, 8501 East Pleasant Valley Rd., 
Cleveland Ohio 44131, or The National Fire Protection Association,  
1 Batterymarch Park, Quincy, MA 02269. 
3.  If after reading this manual you have any questions or do not 
understand any portion of the instructions, call the local gas utility 
or the manufacturer whose name appears on the rating plate.
4.  Carefully plan the place where you are going to put the water 
heater.  Correct  combustion, vent action, and vent pipe installation 
are  very  important  in  preventing  death  from  possible  carbon 
monoxide poisoning and fires, see Figures 1 and 2.
  Examine the location to ensure the water heater complies with 
the “Locating the New Water Heater” section in this manual.
5.  For  California  installation  this  water  heater  must  be  braced, 
anchored,  or  strapped  to  avoid  falling  or  moving  during  an 
earthquake.  See instructions for correct installation procedures.  
Instructions may be obtained from California Office of the State 
Architect, 400 P Street, Sacramento, CA 95814.
6.  Massachusetts Code requires this water heater to be installed in 
accordance with Massachusetts 248-CMR 2.00: State Plumbing 
Code and 248-CMR 5.00.
7.  Complies with SCAQMD rule #1121 and districts having equivalent 
NOx requirements.
IntroductIon
taBle of contents